Order Process · Factory Direct

How to Order

One part-number list is enough to start. You receive a technical reply within 2 working hours, an offer with price, lead time and packing, and a trial order from US$2,000 in any model mix — no container requirement.

2-Hour First Reply US$2,000 Trial Order ~15-Day Production 30% / 70% Terms FOB or Door-to-Door
Photo - export desk checking an order sheet against thread samples
760×520how-to-order-desk-760x520.jpgPhoto - export desk checking an order sheet against thread samples
First technical reply within 2 working hours
US$2,000 minimum, any model mix
~15-day production after drawing confirmation
2–3 m³ solid wooden export crates
Replacement parts and freight on non-conforming batches
01 — The Buying Timeline

From the First Part Number to the Repeat Shipment

Six steps, one export desk. Nothing is quoted before we have read your part numbers or drawing, so the price you receive is the price the workshop can actually build.

01

Send Your Inquiry

Part numbers, a thread standard, or simply a photo of the fitting you are replacing. A rough quantity is enough to start.

02

2-Hour Technical Reply

A sales engineer confirms the specification and comes back with pricing, lead time and packing details within 2 working hours.

03

Trial Order at US$2,000

Mix any model numbers to reach the minimum. No container requirement, so the trial can be small and specific to your market.

04

30% Deposit, 70% Before Shipment

A 30% deposit starts the order. The remaining 70% falls due before the goods leave the workshop.

05

Production and Shipping

Custom production takes about 15 days once the drawing is confirmed. Ship FOB Tianjin / Qingdao, or door-to-door DDP.

06

After-Sales and Repeat

Where a batch does not match the confirmed specification, we supply free replacement parts and carry the freight. Reorders run at 40–60%.

02 — Payment Terms

One Set of Terms, Stated Up Front

The same terms cover a trial order and a repeat shipment, and they are stated on the order documents — there is nothing to renegotiate once production has started.

Stage Standard What It Means For You
Deposit to start 30% Books the production slot; the workshop starts once the drawing is confirmed.
Balance before shipment 70% Payable when the batch is finished, inspected and ready to load.
Trial order minimum US$2,000 Any model mix. No container requirement, so you can test fitment before committing volume.
Custom production ~15 days Counted from the confirmed drawing, not from the first enquiry.
Freight terms FOB Tianjin / Qingdao or DDP Use your own forwarder, or let us quote freight, customs clearance and duties to your door.
Packing 2–3 m³ solid wooden export crates Thread caps, anti-rust protection and moisture-barrier wrapping for sea transit.

To Quote a Freight Line We Need Two Things

Destination: the port or the country you import into.
Shipment size: the model mix and quantity, or the volume you expect to move.
Delivery route: FOB Tianjin / Qingdao with your own forwarder, or door-to-door DDP.
STANDING AFTER-SALES PRACTICE

If a Batch Does Not Match, We Replace It and Pay the Freight

Where dimensions do not match the confirmed specification, we supply free replacement parts and carry the shipping cost. It is handled at batch level through the export desk.


03 — What to Send Us

Five Lines in an Email Are Enough

The more precise the first message, the faster the offer comes back with a number you can order against.

01
Part numbers or the OEM reference. A model list, a spreadsheet extract, or the number stamped on the fitting you are replacing.
02
The thread standard, or a photo. We manufacture to JIC 37°, ORFS, DIN 2353 (24°), BSPP / BSPT, NPT and JIS 30°. A photo or sample sketch is enough if the standard is unknown.
03
Quantity per model. A rough split is fine — it drives the price tier and the crate size, not the process.
04
Destination port or country. FOB Tianjin / Qingdao is the default; give us the destination and we quote a freight line as well.
05
Any market requirement. EU & US market-access certificates are available on request — tell us if your customs or compliance checks need them.

Send the First Part Number Today

A sales engineer confirms the thread standard, replies within 2 working hours and quotes the trial order at the US$2,000 minimum.