Quality & Testing

Quality You Can Check, Not Just Believe.

Four checks decide whether a fitting survives the sea, your warehouse and the machine it lands on: plating, corrosion, thread precision and sealing. This page lists what we control on the floor and what each check changes on your side.

96-Hour Salt Spray Trivalent Zinc (Cr3+) 100% of Production Plated Optical Thread Gauges EU & US Certificates on Request
5,000+ m² Production Workshop, 50+ Staff
Trivalent Zinc (Cr3+) on 100% of Production
96-Hour Neutral Salt Spray
Optical Thread-Gauge Inspection
Rust, Thread & Sealing Checked Batch by Batch
01 — Plating

Trivalent Zinc (Cr3+) on Everything We Ship

Every part that leaves the workshop is zinc plated in a trivalent chromium (Cr3+) bath. That is 100% of production, not a premium finish added to selected part numbers when a buyer insists on it.

We do not run hexavalent chromium. A trivalent bath is not the cheapest way to put a coating on a fitting, but it takes a restricted-substance question off your desk: nothing in the coating that your own customers, or your customs paperwork, have to argue about.

01
Standard, not optional: a reorder six months from now arrives with the same finish as the sample you approved.
02
Checked per batch: rust, thread and sealing performance are controlled batch by batch, not assumed from the last run.
03
Declared on request: the Cr3+ plating statement and the EU & US market-access certificates travel with the quotation.
02 — Corrosion

96 Hours of Neutral Salt Spray, Before the Sea Gets a Chance

Fittings spend more time in a container and on a warehouse rack than most buyers plan for. If the coating gives up early, the rust appears on your shelf, not on ours.

Every batch runs through a 96-hour neutral salt spray test. It is the check that decides whether parts arrive clean after weeks at sea and stay presentable in storage — instead of blooming white rust in the first weeks after arrival, before the carton is even open.

Salt Spray, in Numbers

Test: Neutral salt spray
Duration: 96 hours
Applied to: 100% of plated production
Batch control: Rust, thread and sealing checked batch by batch
What it prevents: Rust bloom during sea transit and warehouse storage
03 — Thread Precision

Threads Held Above General-Factory Practice

A fitting that will not start by hand is a fitting your customer sends back. Ours are CNC machined and checked with optical thread gauges — not by eye, and not on one sample pulled from the top of the crate with the rest assumed to match.

The tolerance we hold sits above general-factory practice. On a part that is threaded, gauged and deburred before plating, the joint seals the first time and keeps sealing once the pressure cycles start.

Machining CNC turning and threading
Verification Optical thread gauges
Tolerance held Above general-factory practice
Sealing faces Deburred before plating
Batch control Rust, thread and sealing performance checked batch by batch against the confirmed specification
04 — On the Floor

The Stations a Batch Passes Before It Is Packed

Three checks stand between the machine and the export crate. The slots below are reserved for the photos of those stations.

05 — Checkpoint Table

What We Check, and What It Changes For You

One row per checkpoint, with the difference it makes on your side of the order rather than another slogan about quality.

Batch Checkpoints

Checkpoint Our Standard What It Changes For You
Plating Trivalent zinc (Cr3+) on 100% of production Eco-compliant coating, no hexavalent chromium to explain to your customers
Corrosion 96-hour neutral salt spray Parts survive sea transit and warehouse storage without rust bloom
Thread precision Held above general-factory practice Threads mate with the port and the hose end first time, without rework
Sealing Rust, thread and sealing performance controlled batch by batch Fewer weeping joints and blown O-rings in the field
Service cycle ~12 months on quality-grade parts — low-grade parts fail at 6–7 months Fewer replacement rounds per year, lower total cost for your end users
Certificates EU & US market-access certificates available on request Clears your local compliance and customs checks
06 — Plating & Thread Practice

The Same Fitting, Two Ways to Make It

What a workshop that treats coating and thread as process controls delivers, and what turns up when they are treated as cosmetics.

✓ How We Run It

  • Cr3+ on the whole run: the same trivalent zinc bath for every part number, on every order.
  • 96-hour salt spray per batch: the test is part of the process, so a coating problem shows up here rather than in your warehouse.
  • Threads gauged, not eyeballed: CNC threading with optical thread-gauge inspection.
  • Sealing faces deburred before plating: a clean cone seats first time.
  • Batch-level records: results tied to the batch you were shipped, checked against the confirmed specification.
  • A known service cycle: about 12 months on quality-grade parts, where low-grade parts fail at 6–7 months.

✗ What We Do Not Do

  • No hexavalent chromium in the plating line — nothing restricted to declare.
  • No treating plating as an optional extra you have to negotiate for.
  • No thread check by eye, and no single sample standing in for a whole batch.
  • No visible burrs left on a sealing bevel for the O-ring to deal with.
  • No rust appearing within weeks of arrival, while the parts are still on your shelf.
  • No claim of quality without a batch record behind it.
07 — Certificates

Market-Access Paperwork, Sent With the Quotation

We hold EU and US market-access certificates for the fittings we export, and send them on request — no account, no form, no waiting for a print run.

On request: EU market-access certificates
On request: US market-access certificates
On request: 96-hour salt spray test logs
On request: Trivalent zinc (Cr3+) plating declaration

Documents We Hold

EUMarket Access
USMarket Access
96HSalt Spray
Cr3+Plating
08 — Not Published Here Yet

What This Page Does Not Show, and Why

The plan for this page also calls for a salt spray test video and third-party comparison reports. We have not published either, because we do not have them: no footage has been filmed for release, and no third-party report on a competitor's fittings sits in our files.

Rather than run an edited clip or borrow somebody else's result, the two slots beside this text are left open and labelled. What we can send today is what we hold: the EU & US market-access certificates and the test record behind the batch you are buying.

Ask for the record behind your own batch

Send the part list and the export desk returns the certificates we hold, the Cr3+ plating declaration and the test record for the batch you are buying — first reply within 2 working hours.