In-Stock Range

Standard Parts Held
For Quick Dispatch.

Standard fittings and adapters held in the workshop warehouse, picked for export as soon as the order and the destination are confirmed. One order may mix part numbers and sizes, the packing is export-ready, and every part leaves the floor with the same trivalent zinc finish and 96-hour neutral salt spray standard as the rest of our production.

2 Models In Stock Any Part-Number Mix 96-Hour Salt Spray FOB Tianjin / Qingdao DDP Door To Door
Warehouse racking with standard hydraulic fittings in stock
720×520stock-warehouse-racking-720x520.jpgWarehouse racking with standard hydraulic fittings in stock
15+ Years Production-Only Factory
Trivalent Zinc On 100% Of Production
96-Hour Neutral Salt Spray
40–60% Reorder Rate
Showing 2 in-stock models See the full catalogue
Dispatch & Lead Time

Stock On The Rack Ships First

Standard models are picked from the workshop warehouse and packed for export as soon as the order and the destination port or address are confirmed. Anything that is not on the rack goes onto our own CNC lines, where a custom size or thread runs at about 15 days after the drawing is confirmed.

One order may mix part numbers and sizes — there is no container requirement, and the $2,000 minimum applies to custom production rather than to standard stock. Ask for the current count on a specific model and the export desk confirms what is on the rack for that part number in the first reply, within 2 working hours.

01
Standard models: held per part number in the workshop warehouse, then picked and packed for export.
02
Not on the rack: custom sizes and threads run ~15 days after the drawing is confirmed, from $2,000 with any model mix.
03
First reply: quantity, packing and the shipping line for your part numbers, within 2 working hours.
RouteStandard stock
PlatingTrivalent zinc (Cr3+)
Salt spray96 hours neutral
MixAny part-number and size mix
Packing2–3 m³ solid wooden crates
ShippingFOB Tianjin / Qingdao · DDP
Fittings capped and wrapped, loaded into a solid wooden export crate
560×360packing-560x360.jpgFittings capped and wrapped, loaded into a solid wooden export crate
Packing & Delivery

Packing That Survives The Sea

Threads are capped, the parts carry anti-rust protection and a moisture barrier, then everything is loaded into solid wooden export crates of 2–3 m³. Freight moves FOB Tianjin or Qingdao, or door to door under DDP with the freight, the customs clearance and the duties covered by us.

Thread protection: Caps on every threaded port
Anti-rust: Trivalent zinc (Cr3+) plus anti-rust protection
Wrapping: Moisture-barrier wrapping inside the crate
Export crate: 2–3 m³ solid wooden crate
Ports: FOB Tianjin / Qingdao
Door to door: DDP incl. freight, clearance and duties
Sea transit: 30–45 days door to door

Need a stock count on a specific model?

Send the part number and the quantity. The export desk checks the rack, confirms what is available, the packing and the shipping line, and replies within 2 working hours.